Installation, Commissioning, Cleaning and Maintenance
Industrial Ethernet OSM/ESM
64
C79000-Z8976-C068-10
5.2 Installation
OSMs/ESMs can be installed in several ways:
•
Installation on a 35 mm standard rail
•
Installation on a SIMATIC S7-300 rail
•
Installation in pairs in a 19" cubicle
•
Wall
mounted
Note
Remember that the OSM/ESM must only be installed horizontally (ventilation slits
top/bottom see Figure 25). To ensure adequate convection, there must be a
clearance of at least 5 cm above and below the ventilation slits. You should also
make sure that the permitted ambient temperature is not exceeded.
Preparations
1. Before installing, check whether the switch setting of the DIP switches is correct
for your application. (see Section 4.2.4.1)
2. Remove the terminal block for power supply and signaling contact from the
OSM and wire up the power supply and signal lines as described in Section
4.1.7.
3. Only for OSMs/ESMs with digital inputs:
When necessary, remove the terminal blocks for the digital inputs from the
OSM/ESM and wire the input signals as described in Section 4.1.8.
Summary of Contents for ESM
Page 32: ...Industrial Ethernet OSM ESM C79000 Z8976 C068 10 28 Network Topologies with OSM ESM 3 ...
Page 94: ...Industrial Ethernet OSM ESM C79000 Z8976 C068 10 90 ...
Page 96: ...Industrial Ethernet OSM ESM C79000 Z8976 C068 10 92 ...
Page 98: ...Index Industrial Ethernet OSM ESM 94 C79000 Z8976 C068 10 ...