Mounting and installation FC2080
Installing the carrier (19", power supply)
6
295 | 354
Building Technologies
008851_s_en_--
Fire Safety
2016-01-27
6 Nut M3
7 Washer M3
8 Spacer sleeve M3
9 2-pin luster terminal
10 Screw M3
1. Position the luster terminal (9) as close as possible to the top of the batteries
(3) or (5) on the crossbar according to the diagram.
2. Secure the luster terminal (9) to the crossbar using a spacer sleeve (8), a
screw M3 (10), two washers (7) and a nut M3 (6).
3. Connect the assembled cable to the luster terminal and the secondary terminal
block, connection 4 and 5, on the corresponding carrier (19", power supply).
4. Mount the temperature sensor (NTC resistor) as shown (2 / 4) directly next to
the batteries.