LMV
Series
Technical
Instructions
Document
No.
LV5
‐
1000
SCC
Inc.
Page
3
Section
4
c.
When
actuator
is
installed
and
coupled,
ensure
that
all
mounting
hardware
is
tightened
adequately,
and
some
method
of
thread
locking
is
employed
on
the
mounting
hardware
(except
for
the
coupling
hardware).
d.
Ensure
environmental
conditions
(temperature,
vibration,
moisture,
etc.)
are
not
exceeded.
3.
Ensure
that
all
wiring
is
per
the
applicable
wiring
diagram
and
also
meets
applicable
local
and
national
codes.
Particular
attention
should
be
paid
to
the
following:
e.
If
a
step
‐
down
control
transformer
is
the
source
of
120
VAC
power
for
the
LMV5,
the
ground
and
neutral
should
be
bonded
(connected)
on
the
transformer.
f.
Voltage
supply
to
a
120
VAC
LMV5
must
be
between
102
and
132
VAC,
47
‐
63
Hz.
Waveform
must
be
a
full
sine
wave.
g.
The
small
transformer(s)
used
for
the
LMV5
(AGG5.210,
typically
blue
or
black)
must
be
wired
and
grounded.
See
Section
2
(Wiring)
for
more
details.
Pay
attention
to
pins
3
and
4
on
terminal
SEK2
and
proper
grounding.
If
more
than
two
SQM48
and
one
SQM45
actuators
are
modulated
at
the
same
time,
a
second
transformer
(AGG5.210)
will
be
required.
h.
CANbus
wire
(AGG5.643)
must
be
used
to
wire
between
actuators.
Plain,
shielded
cable
is
not
adequate
and
is
not
permitted.
i.
Ensure
that
the
last
device
and
only
the
last
device
on
the
CANbus
has
the
termination
jumper
in
the
“Bus
Termination”
position.
See
Section
2
(Wiring)
for
more
details.
The
AZL
has
built
‐
in
termination.
4.
Fuel
(gas)
supply
must
be
adequate
to
support
high
fire
operation
and
fuel
(gas)
train
must
be
sized
correctly.
j.
Fuel
(gas)
pressure
before
the
firing
rate
control
valve
must
be
correct,
stable
and
repeatable
at
all
firing
rates
and
must
not
vary
when
other
fuel
(gas)
burning
appliances
(other
boilers
in
the
building)
are
being
operated.
k.
The
fuel
(gas)
pressure
regulator
on
the
burner
being
commissioned
should
not
be
fully
open
at
high
fire
and
should
not
be
bouncing
off
the
seat
at
low
fire.
Fuel
regulator
must
be
sized
properly,
and
have
adequate
turndown
capability.
5.
A
temporary
stack
gas
analyzer
that
has
been
calibrated
and
at
a
minimum
reads
O
2
(%)
and
CO
(ppm)
must
be
used
for
setting
combustion.
6.
Knowledge
of
what
fuel
flow
represents
high
fire
of
the
burner
/
boiler
combination
and
also
the
turndown
of
the
burner
/
boiler
combination.
This
can
typically
be
found
on
the
burner
/
boiler
nameplate.
HOME
Summary of Contents for LMV 5 Series
Page 2: ...Intentionally Left Blank ...
Page 41: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 7 Section 2 HOME ...
Page 42: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 8 SCC Inc HOME ...
Page 43: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 9 Section 2 HOME ...
Page 44: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 10 SCC Inc HOME ...
Page 45: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 11 Section 2 HOME ...
Page 46: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 12 SCC Inc HOME ...
Page 47: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 13 Section 2 HOME ...
Page 48: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 14 SCC Inc HOME ...
Page 49: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 15 Section 2 HOME ...
Page 50: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 16 SCC Inc HOME ...
Page 51: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 17 Section 2 HOME ...
Page 52: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 18 SCC Inc HOME ...
Page 53: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 19 Section 2 HOME ...
Page 54: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 20 SCC Inc HOME ...
Page 55: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 21 Section 2 HOME ...
Page 373: ...Intentionally Left Blank ...