background image

Document No. 545-407 
Installation Instructions 
February 7, 2003 

Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and 
models as design improvements are introduced. Other product or company names mentioned herein may be the trademarks of their 
respective owners. © 2003 Siemens Building Technologies, Inc. 

 

Siemens Building Technologies, Inc.  
1000 Deerfield Parkway 
Buffalo Grove, IL  60089-4513 
U.S.A. 

Your feedback is important to us. If you have 
comments about this document, please send 
them to technical.editor@siemens.com 

Document No. 545-407 

Printed in the U.S.A. 

Page 2 of 2 

 

MBC/RBC 

Insert the RJ-11 plug of the extension cable 
into the MMI port on the right side of the Open 
Processor or Controller Module (Figure 4 and 
Figure 5). 

The installation is now complete. 

 

 

Figure 4.  MBC/RBC P2 MMI Ports  

Open Processor or Controller Module. 

 

 

Figure 5.  MBC/RBC Stand-alone MMI Ports  

Open Processor or Controller Module. 

FLN Controller 

Insert the RJ-11 plug of the extension cable 
into the MMI port located on the right side of 
the installed Controller Board (Figure 6). 

The installation is now complete.  

FLN0007R1

12

VDC

MMI

 PORT

MMI

MODEM

 PORT

POWER

SWITCH

ON 1

OFF 0

GROUNDING

SPADE

JP2

 

Figure 6.  FLN Controller Board MMI Ports. 

 

Reviews: