802-9081.9 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C • Revision 11
101/293
Installation
14.3
Unloading and transporting to place of installation
➭ Attach ropes to the hoisting tackle.
➭ Sling the ropes around the ends of the wooden pallet.
➭ Unload the transport units and set them down as close to the switchgear building as
possible in order to avoid unnecessary ways.
➭ Thoroughly clean the switchgear room, since extreme cleanliness is required during
installation.
➭ Move the transport units on their wooden pallets as far as possible.
➭ Move the transport units to the switchgear room in the order of installation.
➭ Move the transport units inside the building to the place of installation using a lifting truck,
fork-lift truck or rollers.
➭ Set the transport units down in the correct sequence directly in front of the place of
installation (leave a clearance for installation).
Removing from the
wooden pallets
If the panels are equipped with an interlock for the cable compartment cover or with a locking
device, the panels must be earthed to remove the cable compartment cover.
➭ Remove the PE film.
➭ Undo the bolted joints of the cable compartment cover.
➭ Push the lever of the locking device ① or of the interlock ② upwards and hold it.
DANGER
Transport units falling down
Can cause death, serious injury, or damage the transport units.
The transport units can slip off due to mistakes during transport or while unloading from the
lifting gear.
➭ There must be no persons standing in the swinging area of lifted transport units.
➭ The ropes must not exert any forces on the panel walls under load. Attach ropes far away
on the hoisting tackle.
➭ Observe the dimensions and weights of the transport unit (delivery note).
➭ Please ensure that the lifting and transport gear used meets the requirements as regards
construction and load-bearing capacity.
➭ Observe the center of gravity of the transport units.
➭ Do not climb onto the roof of the panels.
➭ If the low-voltage compartment is removed: Do not step on the mounting plates of the
low-voltage compartment.
➭ Observe the instructions on the packing.
➭ Move the transport units in packed condition for as long as possible. Leave the transport
units packed after unloading for as long as possible.
➭ Do not damage the PE protective foil.