802-9081.9 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C • Revision 11
177/293
Installation
18
Commissioning
18.1
Final work
➭ Check the data on the rating plate and the auxiliary voltage of the control and end devices
as against the requirements.
➭ Check ready-for-service indicator (see page 189, "Ready-for-service indicator").
➭ Check switchgear fixing.
➭ Check the earthing connections.
➭ Check the bolted joints of the low-voltage equipment at random.
➭ Check all parts of the switchgear that have been disassembled and assembled again at site
during installation or that have been installed subsequently, in order to verify correct
assembly and completeness.
Auxiliary transformer
panel
Do only put the auxiliary transformer panel into operation when the transformer is completely
mounted.
➭ Check whether the transformer and the connection cables are completely mounted and
connected.
➭ Check whether the transport angles of the transformer connection cables are removed.
Closing the front cover
➭ Hook the front cover in.
➭ Fasten the front cover at the lower edge tight using 2 bolts with cutting ring M5 (tightening
torque: 7 Nm).
DANGER
Hazardous voltage.
Will cause death, serious injury and property damage.
Always observe the Five Safety Rules:
➭ Isolate.
➭ Secure against reclosing.
➭ Verify safe isolation from supply.
➭ Earth and short-circuit.
➭ Cover or barrier adjacent live parts.
WARNING
High speed moving mechanical parts
Can cause death, serious injury or property damage.
Mechanical components may move quickly, even remotely controlled.
➭ Do not remove any covers from switchgear put into operation.
➭ Do not reach into openings.
DANGER
Internal arcing hazard and explosion hazard
Will cause death, injury or considerable property damage.
If the front cover is not bolted tight, the switchgear is not arc-resistant.
➭ Bolt the front cover together with the switchgear frame. Use the bolts with cutting ring
supplied with the switchgear.