Installation
184/293
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C • 802-9081.9
18.6
Primary injection test
A primary injection test can be performed on the panels.
Performing the test
To test the current transformers, switch the three-position switch of the panel to be tested to
"EARTHED" position and the circuit-breaker to "CLOSED" position.
After that, the test current is applied through the bushings of the cable connection against the
earthing busbar by means of a suitable test unit. Power supply can take place via one or three
phases.
After applying the test current, the secondary measuring devices and tripping systems can be
tested.
18.7
Correcting circuit diagrams
➭ Note any modifications which may have been made during installation or commissioning in
the supplied circuit diagrams.
➭ To have the modifications in the circuit diagrams included, send the corrected circuit
diagrams to the regional Siemens representative.
18.8
Applying operating voltage
Energizing incoming
feeders
➭ Energize all incoming feeders in the respective opposite substation.
Verifying correct
terminal-phase
connections
Verify correct terminal-phase connections of all incoming feeders:
Preconditions
• Use phase comparison test unit according to IEC 61243-5 or VDE 0682-415.
• The panel of the incoming feeder to be tested must be in OPEN position.
• The opposite substation must be de-earthed and live.
Performing the test
➭ Remove the covers of the capacitive test sockets from phase L1 on the incoming feeder to
be tested and on an already energized incoming feeder.
✔ The plug-in sockets of the capacitive voltage detecting system on phase L1 are accessible.
➭ Plug the measuring cables of the phase comparison test unit into the plug-in sockets of the
capacitive voltage detecting system according to the operating instructions.
DANGER
Hazardous voltage and internal arcing
Will cause death, serious injury or property damage.
Do not apply operating voltage before the following instructions have been executed:
➭ Observe the specifications for prevention of accidents.
➭ Observe the operating instructions and work instructions of the switchgear operator.
➭ Install the switchgear according to the installation instructions and drawings supplied.
➭ Perform electrical and mechanical and function test successfully.
➭ Instruct the operating personnel in theory and practice of switchgear operation.
➭ Fit all covers and bolt them tight.
➭ Switch all circuit-breakers and vacuum contactors to OPEN position.
➭ Switch the three-position switches in all panels to OPEN position.
➭ Earth feeders without connected cables. Close all bushings in a surge-proof way.
➭ Switch off connected consumers in all outgoing feeders.
➭ Short-circuit unused current transformers on the secondary side.
➭ Operate unused voltage transformers open on the secondary side.
➭ To assure a consistent phase sequence in the entire switchgear assembly, check the phase
sequence in all incoming and outgoing feeders before connecting them to the busbar.