91 / 176
Siemens
Web server OZW772... V6.0
CE1C5701en
Building Technologies
"Energy indicator" function
2015-10-12
7.3.3 Estimated processing time
After starting the "Energy indicator" function, the "Plant" web page contains the
following:
·
Summary display "Energy indicator"; see Section 7.2.6.
·
Number of monitored data points; see Section 7.2.4.
·
"Estimated processing time"; see below.
The "Estimated processing time" is displayed in hours and minutes.
When monitoring is active, the Web Server first reads each data point from the bus
devices and then compares the values to its "Green limit".
Processing time at base load per data point is 12 seconds (longer if the bus carries
a heavy load).
The Web Server can process up to 2500 "Energy indicator" data points. Thus,
updating the "Energy indicator" (leaf color) display may take hours. Therefore:
·
"Green leaf" (start-up mode)
The "Green leaf" display does not necessarily reflect the current plant state
prior to completion of the "Estimated processing time".
·
The updated display of "Energy indicator" can be postponed by max. the
"Estimated processing time".
Note the restriction from the "updated "Energy indicator" display" also when
navigating to other web pages.
7.3.4 Deactivating "Data point monitoring"
Monitoring "Energy indicator" data points is activated automatically following device
list creation.
Thus, data point monitoring can only be deactivated as a first step.
Deactivation for "Data point monitoring" requires "Administrator" access rights.
The checkbox in the "Energy indicator" column allows for deactivating monitoring
of one or multiple data points e.g. for operational reasons.
Data point monitoring active (default following commissioning)
Data point monitoring deactivated
Estimated
processing time
Processing time
at base load
Updated display for
"Energy indicator"
Note
Deactivation