Installing the Device
2.2 Unpacking the Device
ment ratings. Make sure to review all operating and installation instructions before
commissioning or performing maintenance on the device.
1. Review the relevant certification information for any regulatory requirements.
For more information, refer to
.
2. Mount the device.
3. Connect the failsafe alarm relay.
4. Connect power to the device and ground the device to safety Earth.
5. Connect the device to the network.
6. Configure the device.
2.2
Unpacking the Device
When unpacking the device, do the following:
1. Inspect the package for damage before opening it.
2. Visually inspect each item in the package for any physical damage.
3. Verify all items are included.
NOTICE
If any item is missing or damaged, contact Siemens for assistance.
2.3
Mounting the Device
The RUGGEDCOM RSG2200 is designed for maximum mounting and display flexibili-
ty. It can be equipped with connectors that allow it to be installed in a 48 cm (19 in)
rack, 35 mm (1.4 in) DIN rail, or directly on a panel.
NOTICE
Heat generated by the device is channeled outwards from the enclosure. As such, it
is recommended that 2.5 cm (1 in) of space be maintained on all open sides of the
device to allow for some convectional airflow.
Forced airflow is not required. However, any increase in airflow will result in a reduc-
tion of ambient temperature and improve the long-term reliability of all equipment
mounted in the rack space.
Note
For detailed dimensions of the device with either rack, DIN rail or panel hardware in-
"Dimension Drawings (Page 35)"
8
RUGGEDCOM RSG2200
Installation Manual, 01/2020, C79000-G8976-1043-15