Chapter 4
Installation Procedure
RUGGEDCOM WiN5100/WiN5200
User Guide
22
Cat5 Cable Requirements
Section 4.4
Cat5 Cable Requirements
All Cat5 cables used in the installation of the base station must meet the following requirements:
• Must be provided or approved by Siemens
• Must not be longer than 80 m (262 ft)
• Must be ground as shown in
Solder
Figure 9: Cat5 Cable Grounded
Section 4.5
Mounting Bracket Installation
The following procedures describe how to secure the mounting bracket to the CPE unit.
Procedure: Securing the Mounting Bracket to the Antenna
1. Place the antenna/enclosure base bracket against the back of the antenna. Make sure it is oriented with the
elevation axis.
Summary of Contents for RUGGEDCOM WiN5100
Page 2: ...RUGGEDCOM WiN5100 WiN5200 User Guide ii ...
Page 8: ...RUGGEDCOM WiN5100 WiN5200 User Guide FCC Statement And Cautions viii ...
Page 26: ...RUGGEDCOM WiN5100 WiN5200 User Guide Chapter 2 Product Description LED Indicators 18 ...
Page 28: ...RUGGEDCOM WiN5100 WiN5200 User Guide Chapter 3 Mounting Wall Mounting 20 ...
Page 106: ...RUGGEDCOM WiN5100 WiN5200 User Guide Appendix A WiN5100 WiN5200 Specifications 98 ...
Page 114: ...RUGGEDCOM WiN5100 WiN5200 User Guide Appendix D RUGGEDCOM CPE Warranty 106 ...