Building Technologies
74 319 0619 0 a
17.04.2008
43/288
en
12 Date of first day of
holiday
--.--
(01.01 … 31.12)
…......................
Day.Month
13 Date of last day of
holiday
--.--
(01.01 … 31.12)
…......................
Day.Month
14 Heating curve, flow
setpoint at 15 °C
outside temperature
30 °C
(20…70)
...................
°C
15 Heating curve, flow
setpoint at –5 °C
outside temperature
60 °C
(20…120)
...................
°C
These operating lines are only
active if digital adjustment of the
heating curve has been se-
lected (refer to entry made on
operating line 73)
26 Setpoint
d.h.w.
temperature
NORMAL
55 °C
(20…100)
...................
°C
27 D.h.w.
temperature
Display
function
28 Setpoint d.h.w. tem-
perature REDUCED
40 °C
(8…80)
...................
°C
With plant types x–0 and x–4,
these operating do not appear
31 Weekday (for switch-
ing program 2)
1-7
(1…7)
.........................
1 = Monday
2 = Tuesday, etc.
1-7 = entire week
32 Start of first ON
period
05:00
(00:00…24:00)
.........................
33 End of first ON
period
22:00
(00:00…24:00)
.........................
34 Start of second ON
period
--:--
(00:00…24:00)
.........................
35 End of second ON
period
--:--
(00:00…24:00)
.........................
36 Start of third ON
period
--:--
(00:00…24:00)
.........................
37 End of third ON
period
--:--
(00:00…24:00)
.........................
Switching program 2
--:-- = period inactive
38 Time of day
00:00…23:59
Hours:Minutes
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - info@mytub.co.uk 0844 556 1818