Part Two - Manipulating the Moveable Drawout Element
Connected Position to Test Position
To rack the moveable drawout element from the connected
position to the test position:
Check to ensure that the SB breaker is open (if the breaker
is closed and the interlock lever is moved to the interlock
disengaged position, the breaker will trip).
1.) Set the directional shift lever to the racking-out position.
2.) Pull the interlock lever down to the interlock disengaged
position. (Illustrated beneath padlock device.) If the
breaker contacts are closed, pulling the interlock lever
down will trip the breaker.
3.) Pump the racking pump handle until the moveable
drawout element is in the test position.
4.) When the moveable drawout element reaches the test
position, the interlock lever will automatically return to
the interlock engaged position; the racking pump handle
cannot be pumped; and the position indicator will
display that the moveable drawout element is in the test
position.
Relative position of finger clusters to bus stabs.
Summary of Contents for SBA 1200
Page 68: ...66 External Accessories Ground Fault Sensing and Relaying Courtesy of NationalSwitchgear com ...
Page 94: ...92 Outline Dimension Drawing 2000A Fixed Mounted Courtesy of NationalSwitchgear com ...
Page 95: ...93 Outline Dimension Drawing 2000A Fixed Mounted Courtesy of NationalSwitchgear com ...
Page 100: ...98 Courtesy of NationalSwitchgear com ...
Page 101: ...Electrical Diagrams 99 Courtesy of NationalSwitchgear com ...
Page 102: ...100 Electrical Diagrams Courtesy of NationalSwitchgear com ...