Connection and wiring
7.1 Main circuit connection
3KF switch disconnectors with fuses
54
Manual, 09/2019, L1V30580914002A-01
Installation locations of phase barriers
3KF front operating mechanism, 3-pole, operating mechanism module on
the left-hand side
3KF, front operating mechanism, 3-
pole, operating mechanism module in
the center
3KF, front operating mechanism, 4-pole, operating mechanism
module in the center
3KF, lateral operating mechanism
Note
In position "A", installation of a phase barrier is only required if another device with non-
insulated terminals or a grounded metal part, e.g. another switch disconnector with non-
insulated terminals or a cabinet wall, is located next to the 3KF.
Summary of Contents for SENTRON 3KF LV HRC
Page 1: ...3KF switch disconnectors with fuses ...
Page 2: ......
Page 8: ...Table of contents 3KF switch disconnectors with fuses 6 Manual 09 2019 L1V30580914002A 01 ...
Page 110: ...Maintenance 3KF switch disconnectors with fuses 108 Manual 09 2019 L1V30580914002A 01 ...
Page 148: ...Conversion tables 3KF switch disconnectors with fuses 146 Manual 09 2019 L1V30580914002A 01 ...
Page 157: ......
Page 158: ......