Connection and commissioning
5.2 Mounting and connection
Air circuit breaker 3WL10
138
Manual, 11/2017, L1V30499596002-01
Installing the guide frame
1.
Install the guide frame in the switchboard panel:
Floor mounting (For the drilling template, see Chapter Switchboard panel, hole and
drilling templates, withdrawable breaker (Page 193)):
–
Fasten the guide frame to the base of the switchboard panel with four screws M8 x 25
with a tightening torque of 21 Nm.
Summary of Contents for SENTRON 3WL10
Page 1: ......
Page 2: ......
Page 8: ...Table of contents Air circuit breaker 3WL10 6 Manual 11 2017 L1V30499596002 01 ...
Page 170: ...Operation 6 3 Troubleshooting Air circuit breaker 3WL10 168 Manual 11 2017 L1V30499596002 01 ...
Page 180: ...Technical specifications Air circuit breaker 3WL10 178 Manual 11 2017 L1V30499596002 01 ...
Page 199: ...Air circuit breaker 3WL10 Manual 11 2017 L1V30499596002 01 197 Circuit diagrams 10 ...
Page 212: ...Circuit diagrams Air circuit breaker 3WL10 210 Manual 11 2017 L1V30499596002 01 ...
Page 233: ......
Page 234: ......