 SENTRON 3/6 Bus Plug with Optional SEM3™ Package

 

Note:

 Cable management is highly recommended to avoid  

  damage or accidental disconnection of communication cables.  
  Siemens offers a cable management system to best protect  
  communication cable wiring. This system has catalog number  
  BPSCMK12 and may be routed on any flat surface or the busway  
  per user preference. This kit consists of 12 24-inch spines.

  2) CAT6 Ethernet cables are required to transmit data from the  
    SEM3™ controller to an upstream data management system.  
    The port labeled PC shown in Figure 5 is the data output port
     and should be used for connecting to upstream data   
    management systems. Multiple CAT6 cables may be   
    connected via an Ethernet switch shown in Figure 5 below 
  (sold 

separately).

 

Figure 5: SIEMENS Scalence 8-Port Ethernet Switch

  The output of this Ethernet switch may then be routed back to a  
  centralized building management system via CAT6 cable. Details  
  on this and other network topologies are described in Section  
 8.0.

6.4 OTHER SEM3™ COMPONENTS

 1) 

Current Transformers (CTs) for use

 in the SEM3™ system

     are 100 mA output and are self protecting/shorting. CTs are  
    factory installed in the bus plug. 

Any modification of factory  

    wiring will void the warranty. 

More information on Current  

    Transformers may be found in the 

SEM3™ User Manual

  

  found 

at 

www.usa.siemens.com/SEM3 

2) 

Meter Modules

 are single phase meters that collect energy  

    information via a SEM3™ CT. Meter modules are available  
    in either high (0.2%) or low accuracy (1%) versions. The  
    meter module snaps into a SEM3™ rack assembly, producing  
    an audible click when locked into position. The Meter Rack  
    provides a hard coded address for each meter module. Two  
    and three phase circuits require meter modules to be installed  
    contiguously in the rack. Gaps between modules prevent  
    multi-pole circuit output. Each module must have the phase  

6

    switch on the top of the module set to the phase that the  
    CT is metering. Phase A, B or C (Line 1, 2 or 3 respectively).  
    SEM3™ bus plugs, unless field-wired, are factory configured  
    with meter modules installed and circuit switches pre-set.  
    Additionally, a meter module configuration label is provided  
    on the bus plug cover showing phasing & circuit information,  
    see Section 7.3. 

Figure 6: SEM3™ Meter Module

 

Note:

 Once the meter module is placed into the meter rack

   and energized, the phase position will be indicated by a
   different color LED for each position. Colors are orange for phase
   A (line 1), yellow for phase B (line 2), green for phase C (line 3).  
  LED‘S are adjacent to the phase numbers. The power indication  
  LED also indicates communications by flashing. CT sizing for  
  each meter module will be done through the controller web  
  page configuration.

 3) 

Meter Racks

 have the addresses for the module to controller  

    communications hard coded into them. Three and six meter  
    racks are available in the SENTRON 3/6 Bus Plug.  The three  
    and six module racks have a rotary switch to allow them  
    to be configured for multiple address ranges. See section 7.3  
    for directions on addressing the racks and modules.

  4) The 

Controller 

functions as the set up interface for the  

    system. System settings, CT ratios, PT ratios, alarm settings,  
    communications settings and passwords are all set using the
     web page interface of the controller. See Section 7.1 for  
    directions on configuring the SEM3™ controller. 

Summary of Contents for SENTRON

Page 1: ...SENTRON 3 6 Bus Plug with Optional SEM3 Package usa siemens com busway Installation Manual ...

Page 2: ...OES NOT CREATE NEW WARRANTIES OR MODIFY THE EXISTING WARRANTIES Standards Compliance for the SEM3 Product Approvals and Certifications Accuracy ANSI C12 1 ANSI C12 20 0 2 Safety and Construction CSA C22 2 No 1010 1 Safety Requirements for Electrical Equipment for Measurement UL 916 Energy Management Equipment UL61010 1 IEC 61010 1 Test and Measurement Equipment Electromagnetic Compatibility IEC 61...

Page 3: ...3 4 6 2 SEM3 FCC Notice 4 6 3 Control Wiring 4 6 6 4 Other SEM3 Components 6 8 7 0 Configuring the Metering System 8 9 7 1 Assign Static IP Address 9 10 7 2 Web User Interface 10 7 3 Addressing the Meter Racks 10 11 8 0 Sample Network Topology 12 9 0 Additions to the Network 13 10 0 Contact Information and Support 13 11 0 Notes 14 17 This document makes frequent reference to both the Storage Insta...

Page 4: ...le a claim with the carrier If there is no damage restore the packaging to its original condition to prepare for job site storage Store busway indoors in a clean and dry area with uniform temperature to minimize condensation Protect against mechanical damage and exposure to lime dust concrete water corrosive fumes or liquids and salts Failure to properly store and protect the busway can cause dama...

Page 5: ...ntroller bus plug to limit the length of control wiring and the number of connection points in each network Bus plugs should be installed on the busway prior to connecting network control wiring Limits on control wiring length are noted in Section 6 3 TIP It is suggested to determine the network layout and meter module address plan PRIOR to installing bus plugs on the busway A meter module configu...

Page 6: ...use in 600V applications Care should be taken to follow codes and standards for clearance and isolation of Class 2 wiring from power wiring These are NOT standard Ethernet cables Figure 1 Meter Module Configuration Label Figure 2 600V Isolated Communication Cables CAUTION Failure to use SEM3 components from Siemens could cause damage to the product and place the user at risk of electrical shock or...

Page 7: ...roller in this bus plug will aggregate inputs from metered plugs and output data via the Ethernet port marked PC on the front of the bus plug 10 100BASE T port with an RJ45 modular connector The Ethernet port is capable of data rates up to 100Mbps TIP It is generally recommended to balance the number of meter modules connected to ports R1 and R2 on the controller bus plugs 5 Communication cables b...

Page 8: ...cing an audible click when locked into position The Meter Rack provides a hard coded address for each meter module Two and three phase circuits require meter modules to be installed contiguously in the rack Gaps between modules prevent multi pole circuit output Each module must have the phase 6 switch on the top of the module set to the phase that the CT is metering Phase A B or C Line 1 2 or 3 re...

Page 9: ...ns a fused switch that controls power to the SEM3 controller This switch is shipped in the ON position meaning the SEM3 will turn on when the plug is installed and the busway is powered The fusible switch may be used to turn off the controller Control power for the SEM3 is tapped off the bus on the line side of the breakers so metering continues even when the breakers are in the OFF position 7 ...

Page 10: ...TEM To start Connect the controller to a PC using the Ethernet Modbus TCP port The port labeled PC is located on the front surface of the control module as shown in Figure 9 Connection to this port requires a CAT6 cable This PC port may alternately be connected to an Ethernet switch to consolidate multiple ontroller outputs CONTROLLER ...

Page 11: ...nd select Network and Sharing Center when displayed 2 Then when the Network and Sharing Center opens click on Change adapter settings 3 Right click on your local adapter and select Properties 4 In the Local Area Connection Properties window highlight Internet Protocol Version 4 TCP IPv4 then click the Properties button 5 Select the radio button and enter the correct IP address Ex 192 168 1 100 and...

Page 12: ...re 10 Six Pole Meter Module Rack with 10 Position Rotary Switch Note Meter racks are internal to the bus plug However a view port with rotary switch access hole allows the user to ensure proper phasing of the meter modules and verify that they are receiving power The small hole over the rotary switch allows for the rack to be addressed without opening the bus plug cover The location of the six met...

Page 13: ... 4 33 34 34 34 35 35 35 36 36 37 9 37 37 38 38 38 39 39 40 41 A 41 5 41 42 42 42 43 43 43 44 44 45 B 45 45 46 46 46 47 47 48 49 C 49 6 49 50 50 50 51 51 51 52 52 53 D 53 53 54 54 54 55 55 56 57 E 57 7 57 58 58 58 59 59 59 60 60 61 F 61 61 62 62 62 63 63 Rotary switch adressing setting of 0 is identical to that of 8 similarly 1 is identical to 9 This means racks with switch settings of 0 and 8 or 1...

Page 14: ... metering in each bus plug The run above consists of 7 six pole plugs meaning 42 poles are monitored by the one controller bus plug located in the middle of the run Note that this configuration is within the 45 meter limitation for the maximum number of poles monitored by one SEM3 controller Additionally the maximum length of 600V isolated communication cable for 24 meters or more is 60 feet Five ...

Page 15: ... so as to uniquely address the meters in the new bus plug see Section 7 3 to address the meter rack appropriately Daisy chain the isolated communication cable to the neighboring plug per Section 6 3 The meters will be visible via the controller they are connected to If a SCADA system is integrated with the SEM3 network additional steps may be required to integrate any system modifications or new m...

Page 16: ...14 s l SEM3 Metered Bus Plug for SENTRON Busway Systems 11 Notes ...

Page 17: ...15 s l SEM3 Metered Bus Plug for SENTRON Busway Systems Notes ...

Page 18: ...16 s l SEM3 Metered Bus Plug for SENTRON Busway Systems Notes ...

Page 19: ...17 s l SEM3 Metered Bus Plug for SENTRON Busway Systems Notes ...

Page 20: ...ication in the course of further development of the products The requested performance features are binding only when they are expressly agreed upon in the concluded contract Siemens Industry Inc 5400 Triangle Parkway Norcross GA 30092 1 800 241 4453 info us siemens com Subject to change without prior notice Order No BUIM SEN36 0516 Printed in USA All rights reserved 2016 Siemens Industry Inc usa ...

Reviews: