Page 5
© Siemens AG 2010. All rights reserved
SGT-750 Operation & Maintenance
Summary
Highest uptime: only 17 maintenance
days in 17 years
Maintenance plan optimized for low
cost and high availability with 68 000
EOH time between overhauls (TBO)
24h gas generator exchange to
minimize downtime for planned and
unplanned maintenance
On-site maintenance or off-site with
gas generator exchange
Increased inspection intervals at part
load operation
Long Term Program (LTP) and
comprehensive set of service products
to support high reliability/availability for
entire service life
The SGT-750 viewed from the compressor inlet
17/
17