Connecting and commissioning
9.6 Commissioning the control unit on the fieldbus
ATD4xxW Door Controller for Industrial Applications
System Manual, 01/2017, A5E38080677-AB
269
Commissioning the control unit on PROFIBUS
We recommend the following initial commissioning procedure for a control unit as DP slave
on PROFIBUS DP:
Table 9- 3
Procedure for commissioning the control unit as a DP slave on PROFIBUS DP
Step
Procedure
See...
1
Commission the control unit without a fieldbus connec-
tion as described in the previous sections.
Sections Preparing the con-
(Page 267)
2
Configure the DP master (including PROFIBUS ad-
dress)
Documentation of the DP
master
3
Switch on supply voltage for DP master
Documentation of the DP
master
4
Switch on supply voltage for control unit (DP slave)
a learn run (Page 266) sec-
tion
5
Load the configuration in the DP master
Online help of the configura-
tion tool, e.g. STEP 7
6
Switch DP master to RUN mode
Documentation of the DP
master
7
Controlling LEDs on the control unit
(Page 271) section
Summary of Contents for SIDOOR ATD401W
Page 1: ......