Commissioning
3.2 Switching on the device
Flat Panel
16
Operating Instructions (Compact), 09/2008, A5E02313712-01
3.2
Switching on the device
Procedure
CAUTION
Do not operate the device simultaneously on AC and DC power supplies.
1.
Insert the plug of the supplied power supply cable into the AC or DC power socket of the
device.
2.
Tighten the screws of the supplied cable latch.
3.
Insert the AC power cable of the device into a socket with a grounded protective
conductor.
The device starts up.
4.
Switch on the computer unit.
3.3
Screen Configuration
Configuring the Monitor
You can set the screen resolution and other parameters of the monitor using the Control
Panel of the computer unit.
Call
●
Start menu "Start", command "Settings > Control panel > Display"
NOTICE
A limited set of screen resolutions are available for the monitor. Set the screen
resolution that is suitable for your device. For more information, please refer to the "Flat
Panel" section of the "Description" chapter.
Aotewell Ltd
www.aotewell.com
Industry Automation
HongKong|UK|China
sales@aotewell.com
+86-755-8660-6182