Connecting up
4.2 Grounding
SCALANCE M826
Operating Instructions, 08/2018, C79000-G8976-C362-05
41
4.2
Grounding
A functional grounding must be established for example by connecting a cable from
terminal 5 to the DIN rail, refer to the section "Power supply (Page 45)“ or section “Terminals
(Page 23)“. Such a cable should be kept as short as possible.
If cables are installed permanently, it is advisable to remove the insulation of the shielded
cable and to establish contact on the shield/PE conductor bar.