PN/BACnet LINK
60
Operating Instructions, 10/2017, A5E39895543-AA
Configuring / Programming
9
9.1
Overview
The PN/BACnet LINK is configured in the TIA Portal. Configuration mainly comprises the
following steps:
1.
Dragging PN/BACnet LINK from the HW catalog to the project
2.
S7 controller and PN/BACnet LINK via PROFINET
3.
Setting the PROFINET-specific parameters
4.
Setting the BACnet-specific communication parameters
5.
For server functionality:
–
configure device object
–
Configure server objects
6.
For client functionality:
–
Configure client
–
Import BACnet device modules or create them manually
–
Configure I/O object references
–
If not already done for server functionality, configure device object
7.
Checking and compiling the configuration
The following section contains concise descriptions of the configuring steps for the
PN/BACnet LINK:
The descriptions are not based on any specific example configurations. They are intended to
illustrate the basic method for configuring the PN/BACnet LINK and to provide a fast
introduction to configuring the PN/BACnet LINK.
The versions refer to the TIA Portal V14.
Summary of Contents for SIMATIC PN/BACnet LINK
Page 1: ......