Bedienhandbuch
SIMATIC HMI SCD1900
Seite 9 / 29
DOC-No.: SCD1900 MANUAL.DOC
2
General Installation
Preparation for installing the LCD-device includes the following points:
•
Removal of all packaging
•
Checking of components for damage
•
Comparison of components received with those on the delivery note
•
Connection to the computer system and power supply
•
Building into your system, bearing in mind technical and ergonomic aspects
2.1
Removing the Packaging and Checking Individual Parts
After unpacking all the delivered components, they should be checked for completeness and
for possible transport damage (visual inspection). If any deficiencies are found then please
contact the service department given on the delivery note. Have the delivery note number,
serial number and a description of the deficiency to hand.
The original packaging should be kept for future transportation.
2.2
Scope of Delivery
•
Cable set 1,8 m – VGA, USB und DVI
•
10 bracket
•
Documentation
•
Driver-CD
2.3
Installing the LCD-Device
The SCD1900 will be placed in panel cut out and mounted with 10 clamps (see Fig. 1 and
Fig. 2) at the cut out frame in the rear, 3 clamps each top/bottom and 2 clamps each left/right.
To fix the device the clamps will be hang in the provided holes at the bezel and the screws
tighten (max 50 Ncm) (see Fig. 1 and Fig. 2). The panel cut out is prepared according to the
drawing (see Fig. 5)
The SCD1900 must be close-fitting to the panel to keep the protective. If the surface
structure is coarsely to leaks must be tested.
Attention:
All 10 clumps must be used and both hooks must be hanged up.
The monitor is available for two orientations portrait and landscape.