D.1
Switching on
Table D-1
Items to check during switch-on
Items to check during switch-on
O.K. Comment
Machine started without load for a short period "Start motor"
Direction of rotation checked
When running down from mechanical operation, noises and vibrations at the bear‐
ings and bearing shields checked.
Machine started again and run up to maximum permissible speed - smooth running
checked
With machine running satisfactorily, cooling system switched on
Machine monitored for a while in idling operation
With satisfactory idling performance, load connected to machine
Smooth running checked
Values for voltage, current and output logged
As far as possible, the corresponding values for the working machine are logged.
Temperatures of the bearings, windings, etc., monitored and logged until the sys‐
tem reaches a steady state.
Operating time reduced accordingly if the water-to-water cooler (if installed) is not
operated at this "preliminary" dry run stage.
Note:
Date
Name
Signature
Checklists
D.1 Switching on
SIMOTICS DC 1GG6
144
Operating Instructions 02/2016
Summary of Contents for SIMOTICS DC 1GG6
Page 2: ...08 02 2016 10 27 V4 00 ...
Page 12: ...Table of contents SIMOTICS DC 1GG6 12 Operating Instructions 02 2016 ...
Page 14: ...Introduction 1 1 About these instructions SIMOTICS DC 1GG6 14 Operating Instructions 02 2016 ...
Page 70: ...Commissioning 7 8 Switch off SIMOTICS DC 1GG6 70 Operating Instructions 02 2016 ...
Page 82: ...Operation 8 9 Faults SIMOTICS DC 1GG6 82 Operating Instructions 02 2016 ...
Page 104: ...Maintenance 9 2 Repair SIMOTICS DC 1GG6 104 Operating Instructions 02 2016 ...
Page 138: ...Service and Support SIMOTICS DC 1GG6 138 Operating Instructions 02 2016 ...
Page 142: ...Quality documents SIMOTICS DC 1GG6 142 Operating Instructions 02 2016 ...
Page 153: ......