Equipotential bonding connection, 58
ESD guidelines, 18
Commissioning, 66
F
Flange connection, 39
Follow-up inspection, 84
G
H
Hazardous substances, 17
I
Initial inspection, 84
Inspection
Installation
Speed encoder for type of construction
Insulation class, 22
Insulation resistance, 36, 64, 75
Anti-condensation heating, 38
measure, 36
Interlocking circuit
L
Local service, 137
Long-term storage, 33
M
Machine
Aligning to the driven machine, 47
Disassembly, 96
setting down, 45
Machine expansion, 48
Maintenance
Maintenance intervals, 83
More information, 137
Mounting-foot hole dimensions, 39
N
Natural installation frequency, 72
O
Operating mode, 25
Operating under light-load conditions, 76
P
Paintwork damage, 94
Periods of non-operation
Lubricating before commissioning, 74
Index
SIMOTICS DC 1GG6
150
Operating Instructions 02/2016
Summary of Contents for SIMOTICS DC 1GG6
Page 2: ...08 02 2016 10 27 V4 00 ...
Page 12: ...Table of contents SIMOTICS DC 1GG6 12 Operating Instructions 02 2016 ...
Page 14: ...Introduction 1 1 About these instructions SIMOTICS DC 1GG6 14 Operating Instructions 02 2016 ...
Page 70: ...Commissioning 7 8 Switch off SIMOTICS DC 1GG6 70 Operating Instructions 02 2016 ...
Page 82: ...Operation 8 9 Faults SIMOTICS DC 1GG6 82 Operating Instructions 02 2016 ...
Page 104: ...Maintenance 9 2 Repair SIMOTICS DC 1GG6 104 Operating Instructions 02 2016 ...
Page 138: ...Service and Support SIMOTICS DC 1GG6 138 Operating Instructions 02 2016 ...
Page 142: ...Quality documents SIMOTICS DC 1GG6 142 Operating Instructions 02 2016 ...
Page 153: ......