Polarization index, 36, 38, 64, 75
Positioning, 47
Preparations for assembly, 35
Q
Qualified personnel, 16
R
Re-commissioning, 76
Removal
Speed encoder for type of construction
IM B5, 102
Removing the machine, 96
Restriction of certain Hazardous Substances, 135
Roller bearings
Rolling-contact bearing, 24
Disassembly, 97
Sealing, 98
Rotor
Rotor shipping brace, 28, 40
rotors
S
Safety instructions
Flammable substances, 17
Maintenance work, 83
Sealing, 97
Selection of bolts, 47
Main terminal box, 124, 125, 126, 127
Rolling-contact bearing, 112, 113, 114, 115, 116,
Rolling-contact seal, 122
Speed sensor, 129, 130, 131, 132, 133, 134
Standard flange, 49
Standstill, 76
Stator winding
Roller bearings, 75
Surface of the foundations, 39
System-inherent frequencies, 26
T
Temperature monitoring, 59
Terminal designation, 54
Tightening torques
Turning the machine on to its side, 40
V
Vibration magnitudes, 72
Index
SIMOTICS DC 1GG6
Operating Instructions 02/2016
151
Summary of Contents for SIMOTICS DC 1GG6
Page 2: ...08 02 2016 10 27 V4 00 ...
Page 12: ...Table of contents SIMOTICS DC 1GG6 12 Operating Instructions 02 2016 ...
Page 14: ...Introduction 1 1 About these instructions SIMOTICS DC 1GG6 14 Operating Instructions 02 2016 ...
Page 70: ...Commissioning 7 8 Switch off SIMOTICS DC 1GG6 70 Operating Instructions 02 2016 ...
Page 82: ...Operation 8 9 Faults SIMOTICS DC 1GG6 82 Operating Instructions 02 2016 ...
Page 104: ...Maintenance 9 2 Repair SIMOTICS DC 1GG6 104 Operating Instructions 02 2016 ...
Page 138: ...Service and Support SIMOTICS DC 1GG6 138 Operating Instructions 02 2016 ...
Page 142: ...Quality documents SIMOTICS DC 1GG6 142 Operating Instructions 02 2016 ...
Page 153: ......