D.2
Commissioning
Table D-2
Items to check during commissioning
Items to check during commissioning
O. K.
Remark
The system is correctly installed
The motor has been properly installed
The control and speed monitoring systems are correctly designed and installed
Suitable measures have been implemented for light-load duty ( I < 0.5 I
N
)
Yes/No
The machine has been properly installed and aligned
Output elements are in accordance with specifications with respect to axial position,
alignment and balancing of couplings, etc.
The minimum insulation resistance values are within tolerance
The machine is connected up appropriately for the specified direction of rotation
The grounding and equipotential bonding connections have been made correctly
The rotor can spin without coming into contact with the stator
The flow of cooling air is not impeded
The carbon brushes and brush levers can move freely
The spring pressure on all brush holders is identical
All fixing screws, connecting elements and electrical connections are securely tight‐
ened
The bearings have been relubricated
The bearing insulation is not bridged
Supplementary equipment such as temperature monitoring system, anti-conden‐
sation heating, etc. are connected and fully operational
All protection measures have been taken to prevent accidental contact with moving
or live parts
If the second shaft extension has not been used, its feather key has been secured
to prevent it from falling out
All external fans are ready for operation and have been connected so that they
rotate in the direction specified
Brakes have been tested
If an air-to-water heat exchanger is installed, the water cooler is connected, filled,
air bled, and ready to run
A test run has been carried out without water cooling where there has been a
lengthy time delay between assembly and commissioning
Note:
Date
Name
Signature
Checklists
D.2 Commissioning
SIMOTICS DC 1GG6
Operating Instructions 02/2016
145
Summary of Contents for SIMOTICS DC 1GG6
Page 2: ...08 02 2016 10 27 V4 00 ...
Page 12: ...Table of contents SIMOTICS DC 1GG6 12 Operating Instructions 02 2016 ...
Page 14: ...Introduction 1 1 About these instructions SIMOTICS DC 1GG6 14 Operating Instructions 02 2016 ...
Page 70: ...Commissioning 7 8 Switch off SIMOTICS DC 1GG6 70 Operating Instructions 02 2016 ...
Page 82: ...Operation 8 9 Faults SIMOTICS DC 1GG6 82 Operating Instructions 02 2016 ...
Page 104: ...Maintenance 9 2 Repair SIMOTICS DC 1GG6 104 Operating Instructions 02 2016 ...
Page 138: ...Service and Support SIMOTICS DC 1GG6 138 Operating Instructions 02 2016 ...
Page 142: ...Quality documents SIMOTICS DC 1GG6 142 Operating Instructions 02 2016 ...
Page 153: ......