14.Fix the two free screw connections and tighten by hand.
15.Remove the threaded bars and screw in the two other screws.
16.Tighten all screws (4 x M10, tightening torque 40 Nm).
See also
Connecting cables with cable lugs (Page 89)
Connecting cables without cable lugs (Page 90)
Bringing cables into the terminal box 1XB... with cable gland (Page 88)
6.3.9
Mounting/removing the terminal box
When removing or installing the terminal box cover, secure it using diagonally arranged M10
threaded bars to prevent it falling.
Removing the terminal box
1. Release two diagonally opposing screws at the terminal box cover and replace them by
threaded bars.
2. Release the two other screws.
3. Carefully pull the terminal box cover over the threaded bars.
Mounting the terminal box
1. Screw in the two threaded bars diagonally at the lower section of the terminal box.
2. Slide the terminal box cover over the threaded bars onto the lower section of the terminal
box.
3. Screw the screws into the free holes and tighten by hand.
4. Release the threaded bars.
5. Tighten all four M10 screws, tightening torque 40 Nm.
Electrical connection
6.3 Terminal box
SIMOTICS FD 1LH1
82
Operating Instructions 01/2019
Summary of Contents for SIMOTICS FD 1LH1
Page 2: ...23 01 2019 19 26 V11 01 ...
Page 28: ...Description SIMOTICS FD 1LH1 28 Operating Instructions 01 2019 ...
Page 122: ...Operation 8 10 faults SIMOTICS FD 1LH1 122 Operating Instructions 01 2019 ...
Page 140: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1LH1 140 Operating Instructions 01 2019 ...
Page 162: ...Disposal 11 5 Disposal of components SIMOTICS FD 1LH1 162 Operating Instructions 01 2019 ...
Page 164: ...Service and Support SIMOTICS FD 1LH1 164 Operating Instructions 01 2019 ...
Page 168: ...Quality documents SIMOTICS FD 1LH1 168 Operating Instructions 01 2019 ...
Page 173: ......