9.2.3
First inspection after installation or repair
Perform the following checks after approximately 500 operating hours or at the latest six
months after commissioning:
Table 9-1
Checks after assembly or repair
Check
When the
motor is
running
At stand‐
still
The electrical parameters are maintained.
X
The permissible bearing and winding temperatures are not exceeded
(Page 92).
X
The smooth running characteristics and machine running noise have not
deteriorated.
X
The foundation has no cracks or indentations. (*)
X
X
(*) You can perform these checks while the motor is running or at a standstill.
Additional tests may also be required according to the system-specific conditions.
NOTICE
Machine damage
When carrying out the inspection, if you detect any impermissible deviations from the normal
state, you must rectify them immediately. They may otherwise cause damage to the machine.
Maintenance
9.2 Inspection and maintenance
1MB5 SH 400/450
108
Operating Instructions, 05/2019, A5E45959221A
Summary of Contents for SIMOTICS XP 1MB5 SH400
Page 2: ......
Page 10: ...Table of contents 1MB5 SH 400 450 8 Operating Instructions 05 2019 A5E45959221A ...
Page 156: ...Service support 1MB5 SH 400 450 154 Operating Instructions 05 2019 A5E45959221A ...
Page 160: ...Quality documents 1MB5 SH 400 450 158 Operating Instructions 05 2019 A5E45959221A ...
Page 165: ......