See also
Testing the insulation resistance and polarization index (Page 45)
7.3
Setpoint values for monitoring the bearing temperature
Prior to commissioning
If the machine is equipped with bearing thermometers, set the temperature value for
disconnection on the monitoring equipment before the first machine run.
Table 7-1
Set values for monitoring the bearing temperatures before commissioning
Set value
Temperature
Alarm
115 °C
Shutting down
120 °C
Normal operation
Determine the maximum operating temperature of the bearings T
operation
taking into account the
temperature, bearing load and influences of the plant on the motor in °C. Set the values for
shutdown and warning corresponding to the operating temperature T
op
.
Table 7-2
Set values for monitoring the bearing temperatures
Set value
Temperature
Alarm
T
operation
+ 5 K ≤ 115 °C
Shutting down
T
operation
+ 10 K ≤ 120 °C
7.4
Set values for monitoring the winding temperature
Prior to commissioning
Before running the machine for the first time, set the temperature value for shutdown on the
monitoring device.
Table 7-3
Set values for monitoring the winding temperatures during commissioning
Set value
Temperature
Shutdown
145 °C
Commissioning
7.4 Set values for monitoring the winding temperature
1MB5 SH 400/450
92
Operating Instructions, 05/2019, A5E45959221A
Summary of Contents for SIMOTICS XP 1MB5 SH400
Page 2: ......
Page 10: ...Table of contents 1MB5 SH 400 450 8 Operating Instructions 05 2019 A5E45959221A ...
Page 156: ...Service support 1MB5 SH 400 450 154 Operating Instructions 05 2019 A5E45959221A ...
Page 160: ...Quality documents 1MB5 SH 400 450 158 Operating Instructions 05 2019 A5E45959221A ...
Page 165: ......