Mechanical installation
3.3 Mounting
Converter cabinet units
44
Operating Instructions, 07/2016, A5E03347396A
Figure 3-1
Requirements on the levelness of the floor
The following requirements must be met to ensure the full functionality of the cabinet units:
●
The foundation must be level and horizontal.
●
Irregularities must be leveled out.
●
Gaps where air can enter, created when aligning (e.g.:
①
in the diagram) must be
closed.
3.3.2.3
Shipping and handling monitors
The cabinet units are equipped with tilt and shock indicators to monitor for damage during
transit.
Figure 3-2
Tilt indicator
Summary of Contents for SINAMICS G150
Page 1: ......
Page 2: ......
Page 8: ...Foreword Converter cabinet units 8 Operating Instructions 07 2016 A5E03347396A ...
Page 18: ...Table of contents Converter cabinet units 18 Operating Instructions 07 2016 A5E03347396A ...
Page 679: ......
Page 680: ......