9.4.4.4
Checking the capacitor release
Check the following settings:
● T950
Primary tapping: 400 V + 15%
Secondary side: jumpers 32 – 33
● K950
Measuring-circuit voltage at IN3 (no-load voltage of the C release unit: approx. 320 V)
Switch positions: UNDERLOAD, NO MEMORY (the switches are located at the side).
T1 = 0.1 s
Ue = 30% / release at 180 V
Hysteresis = 5% / enable at 210 V
● K951
Measuring-circuit voltage at IN2
Switch positions: UNDERLOAD, NO MEMORY (the switches are located at the side).
T1 = 0.1 s
Ue = 60% / release at 180 V
Hysteresis = 5% / enable at 202 V
The wiring to the circuit-breaker must be checked according to the circuit diagram.
9.4.4.5
Checking the cable and screw terminals
● Check the cable and screw terminals regularly to ensure that they are secure.
● Tighten the screws if necessary. When doing this, comply with the specified torques
● Check the cabling for defects.
● Replace any defective parts immediately.
9.4.4.6
Checking the plug connections.
Regularly check the plug connections to ensure they are seated correctly and the contacts are
not corroded.
Note
The fiber-optic cables for the gating boards must be properly inserted in the connectors.
Maintenance
9.4 Inspection and maintenance
SINAMICS SM150 6SL3845-2NN41-8AD0
144
Operating Instructions Rev.201908010908 EXAMPLE
Summary of Contents for Sinamics SM150 6SL3845-2NN41-8AD0
Page 2: ...01 08 2019 09 08 V32 00 ...
Page 98: ...Start up SINAMICS SM150 6SL3845 2NN41 8AD0 98 Operating Instructions Rev 201908010908 EXAMPLE ...
Page 187: ......
Page 190: ......
Page 192: ......