Reading out the data storage unit
20
Building Technologies
A54475-A1-A2_EN_05.docx
Fire Safety
01.2018
4.4.4
Service
General information:
The registration of the data will be carried out by the commissioning technician after installation at
the customer's premises
Field 1 Datum
This field is configured by the manufacturer.
Field 2 Machine type
The type and the manufacturer of the machine and/or a specific designation will be
recorded.
The registration is carried out by the commissioning technician.
Field 3 Machine number
The manufacturer and the serial number of the machine will be recorded by the
commissioning technician.
Field 4 Filling pressure test measurement (bar)
The current filling pressure of the Lifdes
TM
with the ball valve closed. An electronic
pressure gauge (manometer) is used for this. The entry will be carried out by the
commissioning technician.
Field 5 Filling pressure after 20 minutes (bar)
The filling pressure after 20 min from the Lifdes
TM
with the ball valve closed are recorded.
An electronic pressure gauge (manometer) is used for this.
The recording is carried out by the commissioning technician.
Field 6 Filling level in %
The filling level is recorded by the commissioning technician according to the
measurement with DIMES (three characters before the decimal point and tow characters
after).
Field 7 Remarks
For free use
Length of the field
Max. 16 characters
Use of this field is not obligatory.
Summary of Contents for Sinorix al-deco STD
Page 31: ......