PROFIBUS DP Communication
8.7 DP slave MCP 483
Manual
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
271
References:
The following manuals are required for the commissioning of the MCP:
/FB1/ Function Manual - Basic Functions, P3 PLC Basic Program, Program Structure and
the Modules of the PLC Basic Program
/FB2/ Function Manual - Extension Functions, H1 Manual and Handwheel Travel, Startup of
Handwheels
/BH/ Operator Components Manual, Description of MCP (interfaces, electrical connection
etc.)
/Z/ Catalog NCZ, Connection components: Cables, connectors, etc.
Automation system
To commission the MCP, the automation system must be fully connected mechanically as
well as electrically, with reference to NC, PLC and MCP.
The drives must be secured against accidental moving.