Power-On and Power-Up
5.2 First power-up
Manual
126
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
5.2.2
Basic commissioning of the PLC
After the Service Desktop is active, the series commissioning file (*.arc) of one of the sample
applications delivered can be loaded for simplifying the PLC commissioning. An application
example includes the basic PLC program and the linking of one of the following MCP.
Path: < Installation path>\support\840dismp\
●
PROFIBUS-MCP: 840disl_tb<version>_DPMCP.arc
●
Ethernet MCP: 840disl_tb<version>_ETHMCP.arc
●
Ethernet-MCP and HT 8: 840disl_tb<version>_ETHMCP_HT8.arc
Proceed as follows for loading the series commissioning file:
1.
Start the "SinuCom NC" commissioning tool from the Windows taskbar: Start > Programs
> SinuCom NC > SinuCom NC
2.
Use SinuCom NC to load the series startup file PLC_SMP.ARC into the PLC.
Menu command: File > Archive > SeriesIBN-Archive > Read
Dialog: Read-in archive
–
Radio button: Data management
–
Button: "NEXT"
–
Select the series commissioning file (*.arc)
–
Button: "FINISH".
This executes the PLC basic startup procedure. NC and PLC run in cyclic mode.