during commissioning. This test option should however definitely „not“ be used while the device is in service
on a live system.
!
DANGER
Danger evolving from operating the equipment (e.g. circuit breakers, disconnectors) by means of the
test function
Non-observance of the following measure will result in death, severe personal injury or substantial
property damage.
²
Equipment used to allow switching such as circuit breakers or disconnectors is to be checked „only
during“ commissioning. Do not under any circumstances check them by means of the testing mode
during real operation performing transmission and reception of messages via the system interface.
i
i
NOTE
After finishing the hardware test, the device will make an initial startup. Thereby, all annunciation buffers
are erased. If required, these buffers should be extracted with DIGSI prior to the test.
The hardware test can be carried out using DIGSI in the Online operating mode:
•
Open the Online directory by double-clicking; the operating functions for the device appear.
•
Click on Test; the function selection appears in the right half of the screen.
•
Double-click in the list view on Hardware Test. The dialog box of the same name opens (see the
following figure).
Structure of the Test Dialogue Box
The dialog box is divided into three groups: BI for binary inputs, REL for output relays, and LED for light-emit-
ting diodes. On the left of each group is an accordingly labelled button. By double-clicking these buttons you
can show or hide the individual information of the selected group.
In the column Status the current status of the particular hardware component is displayed. It is displayed
symbolically. The actual states of the binary inputs and outputs are displayed by the symbol of opened and
closed switch contacts, those of the LEDs by a symbol of a lit or extinguished LED.
The opposite state of each element is displayed in the column Scheduled. The display is made in plain text.
The right-most column indicates the commands or messages that are configured (masked) to the hardware
components.
Mounting and Commissioning
3.3 Commissioning
172
SIPROTEC 4, 7VE61 and 7VE63, Manual
C53000-G1176-C163-3, Edition 10.2017
Summary of Contents for SIPROTEC 4 7VE61
Page 8: ...8 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 24: ...24 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 142: ...142 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 192: ...192 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 222: ...222 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 230: ...230 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 256: ...256 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 314: ...314 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 316: ...316 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 330: ...330 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...