Commissioning Tools
The devices 7VE61 and 7VE63 are designed so that they can be commissioned without external test equip-
ment and recorders. There is also, among others, a protected commissioning aid password (IBS Tool). With
this tool, the CLOSE time can be automatically measured via the device (internal command up to closing the
circuit breaker poles). This process is recorded with the oscillographic fault record.
All measured values relevant for commissioning are available in the operational measured values. The
performance of the synchronizing function and of the device is documented in detail in addition in the opera-
tional indication and synchronising indication buffers. The connection conditions are established in the
synchronisation recording.
A trial at synchronisation is still possible. All procedure run in the device but the two closure relays R1 (BO1)
and R2 (BO2) are not activated. This state can be achieved also via binary input.
The commissioning aids are activated via the parameter 6001
COM. TESTSYNC.
=
ON
.
WEB-Server
As an extension to the universal operating program DIGSI, a web server is contained in the 7VE6*, which can
be activated by means of a remote transmission connection and a browser (e.g. Internet Explorer). The
advantage of this solution is on the one hand that the device can be operated by using standard software
tools, and in principle the Intranet/Internet infrastructure.
On the other hand individual information can be deposited in the device without complication. In addition to
purely numerical values, visualisations facilitate device operation. In particular, defined information and a very
high control security are achieved via graphic illustrations.
shows a sample general view, as it is
known from the classical synchronization function (cursor definition see in “Connection and Definitions” in
Section
). The actual state of the synchronization conditions is clearly evident.
Naturally additional measured value diagrams and indication buffers can be called up. Using the integrated
device operation simulation, in addition for commissioning purposes selected setting values can be adapted.
[ve6-ibs-synchronoskop, 1, en_GB]
Figure 2-26
Browser control – Visualisation of the synchronisation values (Synchroscope)
To avoid simultaneous operation at the device and at the PC, the commissioning a can be adjusted under pass-
word protection only, at the device, or changed from one option to another.
Further details are given in the setting instructions and in chapter “Mounting and Commissioning”.
2.2.1.14
Functions
2.2 Paralleling Functions
60
SIPROTEC 4, 7VE61 and 7VE63, Manual
C53000-G1176-C163-3, Edition 10.2017
Summary of Contents for SIPROTEC 4 7VE61
Page 8: ...8 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 24: ...24 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 142: ...142 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 192: ...192 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 222: ...222 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 230: ...230 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 256: ...256 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 314: ...314 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 316: ...316 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...
Page 330: ...330 SIPROTEC 4 7VE61 and 7VE63 Manual C53000 G1176 C163 3 Edition 10 2017 ...