Installation and Commissioning
8-62
7SA6 Manual
C53000-G1176-C156-2
The synchronism and voltage check must be switched
on
under address
3501
FCT
Synchronism
.
A further aid for checking in the connection are the messages
2947
“
Sync. Udiff>
”
and
2949
“
Sync.
ϕ
-diff>
” in the spontaneous annunciations.
G
Circuit breaker is open. The feeder is isolated (zero voltage). The VTmcb
s
of both
voltage transformer circuits must be closed.
G
The program
OVERRIDE
=
yes
(address
3519
) must be set for the synchro-check;
the other programs (addresses
3515A
to
3518
) are set to
No
.
G
A request for synchro-check is initiated via binary input (FNo.
2906
“
>Sync.
Start
”). The synchro-check must give close release (message “
Sync. re-
lease
”, FNo.
2951
). If not, check all relevant parameters again (synchro-check
configured and switched on correctly, see sections 5.1, 6.1.1 and 6.15.2).
G
Set address
3519
OVERRIDE
to
No
.
G
Then the circuit breaker is closed while the line isolator is open (see Figure 8-31).
Both voltage transformers therefore measure the same voltage.
G
The program
SYNC-CHECK
=
Yes
(address
3515A
) is set.
G
A request for synchro-check measurement is initiated via binary input (FNo.
2906
“
>Sync. Start
”). The synchro-check must give close release (message “
Sync.
release
”, FNo.
2951
).
Figure 8-31
Measuring voltages for synchro-check
G
If not, first check whether one of the aforenamed messages
2947
“
Sync. Udiff>
”
or
2949
“
Sync.
ϕ
-diff>
” is available in the spontaneous messages.
The message “
Sync. Udiff>”
indicates that the magnitude (ratio) adaptation is
incorrect. Check address
215
U-line / Usync
and recalculate the adaptation
factor.
The message “
Sync.
ϕ
-diff>
” indicates that the phase relation of the busbar
voltage does not match the setting under address
212
Usync connect.
(see
Subsection 6.1.1). When measuring across a power transformer, address
214A
ϕ
Usync-Uline
must also be checked; this must adapt the vector group (see
Subsection 6.1.1). If these are correct, there is probably a reverse polarity of the
voltage transformer terminals
Usync
.
G
For the synchro-check the program
Usync< U-line>
=
Yes
(address
3517
) and
SYNC-CHECK
=
Yes
(address
3515A
) is set.
G
Open the VT mcb of the busbar voltage.
U
4
4
7SA6
U
line
Feeder
Busbar
Usync
Summary of Contents for siprotec 7SA6
Page 2: ...Siemens Aktiengesellschaft Book No C53000 G1176 C156 2 ...
Page 18: ...xviii 7SA6 Manual C53000 G1176 C156 2 ...
Page 32: ...Introduction 1 14 7SA6 Manual C53000 G1176 C156 2 ...
Page 82: ...Hardware and Connections 2 50 7SA6 Manual C53000 G1176 C156 2 ...
Page 119: ...SIPROTEC 4 Devices 4 25 7SA6 Manual C53000 G1176 C156 2 Figure 4 20 CFC Logic example ...
Page 190: ...Configuration 5 62 7SA6 Manual C53000 G1176 C156 2 ...
Page 652: ...Installation and Commissioning 8 78 7SA6 Manual C53000 G1176 C156 2 ...
Page 724: ...Technical Data 10 56 7SA6 Manual C53000 G1176 C156 ...
Page 800: ...Appendix A 76 7SA6 Manual C53000 G1176 C156 2 ...
Page 866: ...Appendix B 66 7SA6 Manual C53000 G1176 C156 2 ...