Feeder Shutdown and Commissioning
245
7SS52 V4 Manual
C53000-G1176-C182-3
Figure 6-29 Bay units window
−
Example
Figure 6-30 Bay status window
−
Example
To put a single
bay
for the busbar protection
out of or into service at the bay unit (PC
linked to central unit or to bay unit) proceed as follows:
Open the corresponding bay unit in DIGSI Manager.
Click
Test
in the navigation window.
Double-click
Test
in the function selection. The Tests window opens (Figure 6-22,
Click the entry
COMMUNICATION WITH CENTRAL UNIT
and then click
Run...
.
The window “Test - 4500 COMMUNICATION WITH CENTRAL UNIT” opens
(Figure 6-31, page 246).
www
. com