255
7SS52 V4 Manual
C53000-G1176-C182-3
Installation and Commissioning
7
The installation and commissioning may only be made by experienced commission-
ers. They have to be familiar with the commissioning of protection and control sys-
tems, with the management of power systems and with the relevant safety rules and
guidelines.
This chapter tells you how to install and connect the central unit and the bay units of
the distributed busbar and beaker failure protection SIPROTEC 7SS52 V4 in addition
this chapter tells you which tests with secondary values should be made in order to
put the system into operation with primary values.
www
. ElectricalPartManuals
. com