309
7UM62 Manual
C53000-G1176-C149-3
Installation and Commissioning
3
This section is primarily for personnel who are experienced in installing, testing, and
commissioning protective and control systems, and are familiar with applicable safety
rules, safety regulations, and the operation of a power system.
Installation of the 7UM62 is described in this section. Connections for the device are
discussed. Hardware modifications that might be needed in certain cases are
explained. Connection verifications required before the device is put in service are
also given. Commissioning tests are provided. For primary testing, the protected
object (generator, motor, transformer) must be started up and in put into service.
Checking Connections and System (Plant) Integration
Primary Commissioning Tests with the Generator