3.3 Commissioning
403
7UT613/63x Manual
C53000-G1176-C160-2
– If there are differential currents in the size of the restraint currents (approximately
twice the through-flowing test current), you may assume a polarity reversal of the
current transformer(s) at one side. Check the polarity again and set it right after
short-circuiting all six current transformers. If you have modified these current
transformers, repeat the angle test.
– If there are differential currents which are nearly equal in all three phases, match-
ing of the measured values may be erroneous. Wrong vector group of a power
transformer can be excluded because it should already have been detected
during the phase angle test. Re-check the settings for current matching. These
are mainly the data of the protected object (Power System Data 1, Section 2.1.4):
For all kinds of power transformers, addresses
311
and
312
for side 1 under
„Object Data with Transformers“ and accordingly the parameters for the other
side(s) under test. Furthermore, addresses
512
and
513
for measuring location
M1 under „Current Transformer Data for 3-phase Measuring Locations“, and ac-
cordingly the parameters for the other measuring location(s) under test.
For generators, motors, reactors, addresses
361
and
362
under „Object Data
with Generators, Motors or Reactors“, and addresses
512
and
513
for measur-
ing location 1 under „Current Transformer Data for 3-phase Measuring Loca-
tions“ and accordingly the parameters for the other measuring location(s) under
test.
For mini-busbars (3-phase), address
372
under „Object Data with Mini-Busbars
or Short Lines" (3-phase)“ for feeder 1 and accordingly the parameters for the
other feeder(s) under test, and addresses
512
and
513
for measuring location 1
under „Current Transformer Data for 3-phase Measuring Locations“ and accord-
ingly the parameters for the other measuring location(s) under test.
For single-phase busbar protection, address
381
under „Object Data with
Busbars (1-phase Connection) with up to 6 or 9 or 12 feeders“ and addresses
562
and
563
under „Current Transformer Data for single-phase Busbar Protec-
tion“ for feeder 1 and accordingly the parameters for the other feeders under test.
If interposed summation transformers are used, matching errors can be caused
by wrong connections at the summation CTs.
• Finally, switch off the test source and the protected object (shut down the genera-
tor).
• If parameter settings have been changed for the tests, reset them to the values nec-
essary for operation.
Please keep in mind that the previous tests must be repeated for each current path.
Summary of Contents for SIPROTEC 7UT613 series
Page 16: ...Contents 16 7UT613 63x Manual C53000 G1176 C160 2 Literature 631 Glossary 623 Index 633 ...
Page 30: ...1 Introduction 30 7UT613 63x Manual C53000 G1176 C160 2 ...
Page 506: ...A Appendix 506 7UT613 63x Manual C53000 G1176 C160 2 7UT633 D E ...
Page 508: ...A Appendix 508 7UT613 63x Manual C53000 G1176 C160 2 7UT633 P Q ...
Page 510: ...A Appendix 510 7UT613 63x Manual C53000 G1176 C160 2 7UT635 D E ...
Page 512: ...A Appendix 512 7UT613 63x Manual C53000 G1176 C160 2 7UT635 P Q ...
Page 515: ...A 2 Terminal Assignments 515 7UT613 63x Manual C53000 G1176 C160 2 7UT633 B ...
Page 517: ...A 2 Terminal Assignments 517 7UT613 63x Manual C53000 G1176 C160 2 7UT633 N ...
Page 519: ...A 2 Terminal Assignments 519 7UT613 63x Manual C53000 G1176 C160 2 7UT635 B ...
Page 521: ...A 2 Terminal Assignments 521 7UT613 63x Manual C53000 G1176 C160 2 7UT635 N ...
Page 622: ...A Appendix 622 7UT613 63x Manual C53000 G1176 C160 2 ...
Page 632: ...Literature 632 7UT613 63x Manual C53000 G1176 C160 2 ...