4 Technical Data
478
7UT613/63x Manual
C53000-G1176-C160-2
4.17
Circuit Breaker Failure Protection
Circuit Breaker Supervision
Starting Conditions
Times
Current flow monitoring
0.04 A to 1.00 A
1)
for the respective side
Steps 0.01 A
Dropout-to-pickup ratio
approx. 0.9 for
I
≥
0.25 A
1)
Tolerance
5 % of set value or 0.01 A
1)
Breaker status monitoring
via circuit breaker auxiliary contacts and
binary input
1)
Secondary values based on
I
N
= 1 A; for
I
N
= 5 A the currents must be multiplied by 5.
For breaker failure protection
internal trip
external trip (via binary input)
Pickup time for f
N
= 50 / 60 Hz
approx. 3 ms with measured quantities,
approx. 20 ms after switch-on of measured
quantities
Pickup time for f
N
= 16.7 Hz
approx. 60 ms after switch-on of measured
quantities
Dropout time for f
N
= 50/60 Hz
approx. 25 ms
Dropout time for f
N
= 16.7 Hz
approx. 75 ms
Times
0.00 s to 60.00 s;
∞
Steps 0.01
Time tolerance
1 % of set value or 10 ms
Summary of Contents for SIPROTEC 7UT613 series
Page 16: ...Contents 16 7UT613 63x Manual C53000 G1176 C160 2 Literature 631 Glossary 623 Index 633 ...
Page 30: ...1 Introduction 30 7UT613 63x Manual C53000 G1176 C160 2 ...
Page 506: ...A Appendix 506 7UT613 63x Manual C53000 G1176 C160 2 7UT633 D E ...
Page 508: ...A Appendix 508 7UT613 63x Manual C53000 G1176 C160 2 7UT633 P Q ...
Page 510: ...A Appendix 510 7UT613 63x Manual C53000 G1176 C160 2 7UT635 D E ...
Page 512: ...A Appendix 512 7UT613 63x Manual C53000 G1176 C160 2 7UT635 P Q ...
Page 515: ...A 2 Terminal Assignments 515 7UT613 63x Manual C53000 G1176 C160 2 7UT633 B ...
Page 517: ...A 2 Terminal Assignments 517 7UT613 63x Manual C53000 G1176 C160 2 7UT633 N ...
Page 519: ...A 2 Terminal Assignments 519 7UT613 63x Manual C53000 G1176 C160 2 7UT635 B ...
Page 521: ...A 2 Terminal Assignments 521 7UT613 63x Manual C53000 G1176 C160 2 7UT635 N ...
Page 622: ...A Appendix 622 7UT613 63x Manual C53000 G1176 C160 2 ...
Page 632: ...Literature 632 7UT613 63x Manual C53000 G1176 C160 2 ...