Commissioning
8.4 Commissioning with steam or liquid
SITRANS P300 with HART communication
Operating Instructions, 06/2005, A5E00359579-02
8-3
8.4
Commissioning with steam or liquid
Overview
$
%
Figure 8-1
Measuring steam
(1)
Pressure transmitter
(2)
Shut-off module
(2A) Shut-off valve to process
(2B) Shut-off valve for test connection or for bleed screw
(3)
Pressure line
(4)
Shut-off valve
(5)
Drain valve
(6)
Compensation vessel (steam only)
Requirement
All valves are closed.
Procedure
To commission the transmitter for steam or liquid, proceed as follows:
1. Open the shut-off valve for the test connection (2B).
2. Via the test connection of the shut-off module (2), apply the pressure corresponding to
the zero point to the pressure transmitter (1).
3. Check the zero point.
4. If the zero point differs from the value desired, correct it.
5. Close the shut-off valve for the test connection (2B).