Configuration
6.2 Configuring the busbar run layout
SIVACON 8PS - Configuring with LX system
Configuration Manual, 10/2011, A5E02194899-02
117
Vertical busbar run layout between infeed and junction unit, Case 3
●
Position the first expansion compensation unit immediately after the infeed.
●
Position further expansion compensation units in the centre between the fixed points.
)3
)3
)3
/
/
/
/
'
'
'
L1
Max. permissible sub-length
L2
Halved max. permissible sub-length
L
Total run length
D
Expansion compensation
FP Fixed point (type: LX-BVFP..)
EF End cap
Examples of power transmission with LXA...., (LXC....)
Run length L
[m]
Number of fixed points (FP)
Number of expansion
compensation units (D)
≤ 6 (≤ 6)
1
0
≤ 12,5 (≤ 20)
1
1
≤ 37,5 (≤ 60)
2
2
≤ 62,5 (≤ 100)
3
3
Examples of power distribution with LXA...., (LXC....)
Run length L
[m]
Number of fixed points (FP)
Number of expansion
compensation units (D)
≤ 6 (≤ 6)
1
0
≤ 25 (≤ 30)
1
1
≤ 75 (≤ 90)
2
2
≤ 125 (≤ 150)
3
3