45/148
Siemens Building Technologies
Commissioning instructions OZW775 V2.01
CE1C5663en
HVAC Products
Parameterize OZW775
22.06.2012
4 Parameterize
OZW775
4.1 Parameterization using ACS
Start to parameterize the central communication unit OZW775 only after you have
carried out the following commissioning steps:
•
New plant created; see Section 3.1
•
Device list created in central communication unit; see Section 3.2.1
•
Device list created in ACS; see Refresh reference data points, Section 3.2.5
4.1.1 ACS functions
ACS Service and ACS Operation contain the parameterization functions. Some
functions are available only via
Applications > Parameter settings…
Applications > Popcard…
or in both applications (see table).
Applications
Function
Parameter
settings…
Popcard…
Plant
1)
Edit device list…
1)
X
Refresh reference data points
X
Copy standard parameter set
X
Basic and extra configuration
X
Write / read parameter set
X
Export / import parameter set
X
Operating page "Commissioning"
X X
Operating page "Settings"
X X
Operating page "Time switches"
X X
Operating page "Message receiver"
X X
Operating page "Inputs"
X
Operating page "Outputs"
X
Operating page "Operation selector"
X
Operating page "Meter"
X
Operating page "Operating hours"
X
Operating page "Time / Date"
X
Operating page "Faults current"
X
Operating page "Device information"
X
Commissioning mode On/Off
X
Wiring test
X
Test and diagnosis message receiver
X
Test and diagnosis communication
X
1)
"Plant" column
Plant > Edit device list…