TPS3  02  Installation  Instructions  for: 

Lighting Panelboards Revised P1

If model number includes W option suffix, additional instructions follow:

The following instructions are for the installation of the Siemens TPS3 
02 and L2 SPD modules in Siemens Revised P1 lighting panelboards. Be 
aware of differences between the Revised P1 and Original P1 panelboards. 
SPDs for Original P1 and Revised P1 are not interchangeable. Original P1 
panelboards use TPS3 01 or L1 SPDs, whereas Revised P1 panelboards 
use TPS3 02 or L2 SPDs. 

To determine if a customer has a Revised P1 panel – look at the part 
number of the interior. If the part number ends with “N” or “T” then 
it is a Revised P1. If it does not end in either “N” or “T” then it is an 
Original P1 panel. For example: P1E42MC250A is an Original P1 panel 
and P1E42MC250AT is a Revised P1 panel. If it is a Revised P1 panel 
ending in “N” – then there is no Subfeed space and no place for an SPD 
to be installed internally. 

All hardware is supplied for complete installation of the TPS3 module. 
See page 3, Table 2 for Catalog numbers.

Figure 5: 250 Amp Max Revised P1 Panels

Determine  the  mounting  location  of  the  TPS3  in  the  distribution 
equipment.  If  the  TPS3  module  is  field  installed  in  the  bottom,  or  if 
it is mounted in a factory assembled panelboard, the internal phase 
label  connections  are  correct  as  shipped. 

If  mounted  in  the  top  of 

the distribution equipment or relocated after installation, internal 
phase  labeling  connections  must  be  changed  to  ensure  proper 
diagnostic  board  indication.

  These  modifications  should  be  made 

prior to installation. 

Internal Phase Labeling Connections

A single 14 wire ribbon cable is internally attached to the display pcb. 
Display board must be removed with 4 black phillips screws. When the 
ABC phase sequence changes to CBA, the single connector is removed 
from the normal “ABC” jack and installed in the jack labeled “CBA”.

Lock off all power supplying this equipment before working on it. 

Remove the trim and dead front. If SPD is hard-buss connected to busses: 
(If connected through breaker, see W option instructions on page 10)

Attach Connectors (items 5, 6 & 7) to outboard and center Phase buss 
bars using ¼”-20 x ½” slotted machine screws (item 3). Each Connector 
is Phase specific. Refer to Figures 5 & 6 (top right) for orientation. For 
400A use inner holes on outer phases and center hole on center phase. 
Machine screws thread into the Connector mounted below the buss 
bar. Do not tighten at this time.

Position the TPS3 unit (item 1) on the panel base rail so that the TPS3 
neutral connector is in front of the panel neutral and the phase tabs 
are above the Connectors. Slide the TPS3 unit toward the interior until 
the four mounting holes line up with the four holes in the base rail.

Attach the TPS3 unit to the base rail using four (4) of the #10-24 x 9/16” 
slotted hex washer head thread forming screws (item 2) provided as 
shown in Figures 5 and 6 (top right).

Fasten  TPS3  unit’s  Phase  tabs  to  the  Connectors  using  three  (3)  of 
the #10-24 x 9/16” slotted hex washer head thread forming screws  
(item 2). Do not tighten at this time.

1

2

2

2

10

13

11

12

4

8

13

2

Item Description

Qty. Torque Value

1

TPS3 (See Page 3, Table 2)  (SPD)

1

2

#10-24 x 9/16” Slotted Hex Thread  

Forming Screw (Bus rail mounting Screws)

7

30 lb-in

3

1/4-20 x 1/2” Slotted Hex Head 

Machined Screw (busbar connection)

3

72 lb-in

4

1/4-20 x 5/8 Hex Head Machined 

Screw (busbar connection)

1*

72 lb-in

5

Connector Outboard Phase

1

6

Connector Center Phase 

1

7

Connector Outboard Phase

1

8

Neutral Jumper 

1*

9

Nut ¼-20 SEMS

1*

10 Neutral Riser Support

1*

11 #10-16 x ½” Type BT Slotted  

Hex Thread Forming Screw

1*

15 lb-in

12 Neutral Riser

1*

13 5/16”-18 x ½” Slotted Hex Thread  

Forming Screw

2*

CU - 72 lb-in

AL - 108 lb-in

Table 5: Content for Installation in Lighting Panelboards Revised P1

Hazardous voltage.

Will cause death or serious injury.

Keep Out.

Qualified personnel only.

Disconnect and lock off all power before 

working on this equipment.

V  

DANGER

Parts with asterisk (*) not included in Delta units having no neutral.

7

Summary of Contents for TPS3 01

Page 1: ...User Manual CANADA TPS3 Internal Manual Surge Protective Device ...

Page 2: ...an lead to abnormally high voltages at the SPD This may cause the SPD to fail The warranty is voided if the SPD is incorrectly installed and or if the neutral conductor in the service entrance equipment or downstream of separately derived systems is not bonded to ground in accordance with the NEC Do Not Hi Pot Test SPDs Any factory or on site testing of power distribution equipment that exceeds no...

Page 3: ...s 10 W Option Suffix 10 Operation 11 TPS3 Control Diagnostic Display Panel 11 Display Panel with Surge Counter Option 11 Dry Contacts Feature 11 Maintenance 12 Troubleshooting Service 12 Abnormal N G Voltage Indicators 12 Module Replacement Service 12 Display Replacement 12 Preventive Maintenance Inspection Testing 12 Corrective Maintenance Repair 12 Technical Support 12 Tables Table 1 Type Design...

Page 4: ...enance Shouldfurther information be desired or should particular problems arise which are notcoveredsufficientlyforthepurchaser spurposes themattershould be referred to the local Siemens sales office Do Not Hi Pot Test SPDs Anyfactoryoron sitetestingofpowerdistributionequipmentthat exceedsnormaloperatingvoltagesuchashigh potentialinsulation testing or any other tests where the suppression componen...

Page 5: ...s can be tested for Type 1 Type 2 or Type 3 applications Siemens TPS3 SPDs have the following Type designations Table 1 Type Designations SIEMENS TPS3 SERIES TYPE RATING TPS3 01 L1 Type 1 Component Assembly TPS3 02 L2 Type 1 Component Assembly TPS3 05 L5 Type 1 TPS3 06 L6 Type 1 Component Assembly For further information please review latest editions of NEC Art 285 UL 1449 contact your local Sieme...

Page 6: ... 220V 3Ø 4W Plus Grnd Fig 2 L 600Y 347V 3Ø 4W Plus Grnd Fig 2 S 400Y 230V 3Ø 4W Plus Grnd Fig 2 SURGE CURRENT RATING TPS3 01 TPS3 L1 TPS3 02 TPS3 L2 TPS3 05 TPS3 L5 TPS3 06 TPS3 L6 10 100kA per phase 15 150kA per phase 20 200kA per phase 25 250kA per phase 30 300kA per phase 40 400kA per phase 45 450kA per phase 50 500kA per phase OPTION CODE DESCRIPTION TPS3 01 TPS3 L1 TPS3 02 TPS3 L2 TPS3 05 TPS...

Page 7: ...ven rods etc NEC and IEEE Std 142 2007 are appropriate standards For sensitive electronics and computer systems ground impedance should be as low as possible When metallic raceway is used as an additional grounding conductor an insulated grounding conductor should be run inside the raceway and sized per the NEC Adequate electrical continuity must be maintained at all raceway connections Do not use...

Page 8: ...tions A single 14 wire ribbon cable is attached to the display pcb When the ABC phase sequence changes to CBA the single connector is removed from the normal ABC jack and installed in the jack labeled CBA Lock off all power supplying this equipment before working on it Remove the trim and dead front Remove the two 2 dead front supports Position the TPS3 unit on the panel base rail so that the TPS3...

Page 9: ...ire ribbon cable is attached to the display pcb When the ABC phase sequence changes to CBA the single connector is removed from the normal ABC jack and installed in the jack labeled CBA Lock off all power supplying this equipment before working on it Remove the trim and dead front Install the mounting bracket Item 5 to the base rail as shown in Figure 3 using two 2 of the 10 thread forming screws ...

Page 10: ...er supplying this equipment before working on it Removethetrimanddeadfront IfSPDishard bussconnectedtobusses If connected through breaker see W option instructions on page 10 Attach Connectors items 5 6 7 to outboard and center Phase buss bars using 20 x slotted machine screws item 3 Each Connector is Phase specific Refer to Figures 5 6 top right for orientation For 400A use inner holes on outer p...

Page 11: ...S3 item1 neutral tab with 20 x 5 8 machine screw item 4 and 20 SEMS nut item 9 Do not tighten at this time 400A panels only rotate neutral jumper so single hole end lands on SPD neutral to ensure proper height and fitment Use 1 5 16 18 slotted hex thread forming screw item 13 to connect other end of neutral jumper to existing neutral bussing 250A only not required for 400A Install Neutral Riser it...

Page 12: ... TPS3 SPD module in Siemens TPS3 05 unit Figure 6 P4 P5 Front Connected Distribution Switchboards NOTE TPS3 06 unit may be replaced only if supplied with an internal disconnect Lock off all power supplying this equipment before working on it Open unit door and turn the internal disconnect to the off position Remove the neutral lug wire from the disconnect switch Remove the phase wires from the TPS...

Page 13: ...ith or without one or more yellow stripes is to be installed as part of the circuit that supplies the filter Reference should be made to Table 250 122 of the National Electrical Code regarding the appropriate size of the grounding conductor b The grounding conductor mentioned in item a is to be grounded to earth at the service equipment or other acceptable building earth ground such as the buildin...

Page 14: ...own with Surge Counter Figure 10 Display Vertical Shown with Surge Counter Dry Contacts Feature TPS3 01 05 and 06 units are equipped with dry contacts This feature provides Normally Open N O and Normally Closed N C circuits which can be used for remote indication of a failed transient voltage surge suppressor There is only one dry contact output consisting of two electrically isolated sets of NC C...

Page 15: ...e systems where SPDs are designed for grounded systems SPDs for ungrounded systems generally have higher MCOV to allow for L G voltage fluctuations Failures of this nature are not defects in the SPDs workmanship or material This is an installation error and is not covered by warranty A differential voltage circuit monitors neutral to ground voltage When N G voltage becomes excessive an amplifier e...

Page 16: ...ad East Oakville ON L6H 0H6 SPD Hotline 888 333 3545 info purgethesurge ca 2 16 15 lh 8225 European Authorized Representative Obelis s a Boulevard Général Wahis 53 1030 Brussels BELGIUM Tel 32 2 732 59 54 Fax 32 2 732 60 03 E Mail mail obelis net ...

Reviews: