24
Siemens Building Technologies
Fire Safety & Security Products
10.2008
PC COM Port 25-Way ‘D’ Female
VIS3I-328 Test/Config Connector 9-Way ‘D’ Male
2 3
3 2
7 5
Tab. 5
Cable wiring for 25-way PC COM port
A Baud rate of 38400 is required for communication between the PC and the
Test/Config Connector port on the VIS3I-328. You select the communication Baud
rate using the VisiPC software, as detailed in the User Manual.
8.3
Set VisiPC default product to integrated
1.
Run the VisiPC software.
2.
If VisiPC starts as the
Visilynx 3 Tester and Simulator
, select the
Visilynx3
Configurator
sub-program at the
Switch
drop-down menu, as detailed in the
VisiPC Software User Manual.
3.
From the
Options
drop down menu highlight
Default Product
and select
Integrated
.
NOTE
This ensures that factory set default data applicable to VIS3I-328 is always loaded when the New
option is selected at the
File
drop-down menu.
8.4
Connect and power up the VIS3I-328s
1.
If you want to connect two VIS3I-328s as a single expanded matrix node, you
need to connect an expansion cable (Type VIS3I-EXP) between the
expansion connectors on each rear panel. You should set the Master – Slave
switch on the rear panel of each unit, as required.
2.
Connect each VIS3I-328 to the AC mains supply (see chapter 3.1
Specifications for the allowed mains voltage range).
3.
Switch on the mains power supply to the VIS3I-328. For an expanded matrix
node, switch on both VIS3I-328s simultaneously. If this is not possible, switch
on the Slave VIS3I-328 first.