8
Service and maintenance
8.1
General notes about maintenance
ATEX version gearboxes
All measures, checks, and their results must be documented by the operator and
records kept in a safe place.
WARNING
Danger of severe injuries caused by the unintentional starting of the drive unit
Secure the drive unit to prevent it from being started up unintentionally.
Attach a warning notice to the start switch.
NOTICE
Material damage caused by improper maintenance
Service and maintenance must only be carried out by properly trained and authorized
personnel. Only original parts supplied by Siemens AG can be used for servicing and
maintenance.
Note
The gearbox is lubricated for life.
Lubricant changes are not required.
All inspection, maintenance, and repair work must be carried out with care by trained
personnel only. Observe the information in Section General information and safety notes
Table 8- 1
Maintenance measures
Measure
Interval
Description of work
Monitor and check the geared
motor for unusual noises,
vibrations and changes
Daily; if possible, more
frequently during operation
Check housing temperature
After 3 hours, on the first day,
thereafter monthly
BA 2012
Operating Instructions, 03/2013, 70000004024300
37
Summary of Contents for Worm Gearbox S 5 BA 2012
Page 1: ...Answers for industry MOTOX MOTOX Worm Gearbox S BA 2012 Operating Instructions 03 2013 ...
Page 2: ......
Page 34: ...Commissioning BA 2012 32 Operating Instructions 03 2013 70000004024300 ...
Page 36: ...Operation BA 2012 34 Operating Instructions 03 2013 70000004024300 ...
Page 44: ...Disposal BA 2012 42 Operating Instructions 03 2013 70000004024300 ...
Page 53: ......