65
Once you’ve checked that the lights are turning on, press the e-stop button to turn it back off.
Now, connect the emergency stop button to the control box via the connector on the top. You should be able to
find your e-stop button (pictured on the right) in a bubble wrapped bag in the variable box. Unclick the e-stop by
rotating it then look for the red light at the top of the control box to light up to confirm that all the power wiring is
coming through correctly.
Next, plug the connector coming from the power brick into the rear of the LongMill’s control box (pictured); wait
until after it’s plugged in before plugging the AC cable on the other end into the wall.
Summary of Contents for LongMill MK2
Page 1: ...1 LongMill MK2 Assembly Manual MK2 ...
Page 7: ...7 Part 1 X Z Axes ...
Page 22: ...22 Part 2 Y Axis Gantries ...
Page 34: ...34 You should now have two Y axis rail assemblies They should be a mirror copy of each other ...
Page 35: ...35 Part 3 Axes Completion ...
Page 44: ...44 Part 4 Motors Wiring ...
Page 62: ...62 Part 5 Checks First Moves ...
Page 77: ...77 Part 6 Table Mounting ...