23
Parts Needed:
XZ-axis gantry sub-assembly
Z-axis motor sub-assembly
M8-25mm bolt
M8 nut
x2
x2
Previously Assembled
Connecting the two major sub-assemblies
Get the motor sub-assembly from before. Holding it in one hand, and the gantry sub-assembly in the other, line up
the lead screw from the motor assembly with the nut block of the gantry assembly. If you use your fingers to turn
the lead screw, it will go into the nut. The plastic mount should be coming in from the side of the steel plate which
has a rectangular notch cut out.
If you have trouble turning the lead screw into the nut, try loosening the bolts holding the nut to the plate. Also, be
sure that the tensioning bolt (sticking upwards) is completely loose.
Summary of Contents for LongMill V2
Page 1: ...1 LongMill V2 Assembly Manual V2 ...
Page 4: ...4 Part 1 XZ Axis Gantry ...
Page 22: ...22 The completed assembly should look like this ...
Page 29: ...29 Part 2 Y Axis Gantries ...
Page 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Page 40: ...40 Part 3 X Axis Rail ...
Page 43: ...43 Your completed rail should now look something like this ...
Page 57: ...57 Part 4 Y Axis Rails ...
Page 68: ...68 Part 5 Drag Chains and Wiring ...
Page 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Page 83: ...83 Part 6 Electronics ...
Page 93: ...93 Part 7 Table Mounting ...
Page 97: ...97 ...
Page 110: ...110 Bottom Carton 3 In our final carton you will find all of your 3D printed parts ...