SDS2000 X HD Ser vice Manual
25
5
Performance Test
This chapter explains testing the oscilloscope to verify performance specifications. For accurate test
results, please let the test instruments and the oscilloscope warm-up for at least 30 minutes before
testing.
Below is the required equipment for the test:
Table 2 Required test equipment
Equipment
Description
Qty
Test item
Fluke 9500B
3.2 GHz High-Performance
Oscilloscope Calibrator
1
DCG accuracy \ Offset accuracy \
DC measurement accuracy \
Timebase accuracy \ Trigger level \
Trigger sensitivity \ BW \ BWL \
Input impedance\...
Fluke 9530
Active Head
≥
2
The figures below show the test setups:
DUT
9500B
9530 Active Head
Figure 7 Test setup for DCG / Offset / Timebase
Note
: The 9530 active head in Figure 7 is connected to any channel of the 9500B, and its BNC
connector is connected to the specified channel of the oscilloscope according to the test.